What type of installation do you apply to each subsystem (outside, buried in trenches, in ducts, etc...)?
RatedPower uses 3 types of installation:
- Fastened to structures (in direct contact with air) for string cables
- Buried in trenches for the rest of LV and MV cables
- Overhead (towers) for HV