What type of installation do you apply to each subsystem (outside, buried in trenches, in ducts, etc...)?

RatedPower uses 3 types of installation:  
  • Fastened to structures (in direct contact with air) for string cables 
  • Buried in trenches for the rest of LV and MV cables  
  • Overhead (towers) for HV