Knowledge Base
English
Español
Español
FAQs
Starting with RatedPower
Site details
Main equipment
Design configuration
Grid connection point
BESS
Energy
Financial
Documents
Guides for Users
Site files
Topography files
Layout
3D scene
Security
FAQs
Location
Equipment
Layout
Topography
Grid point
Electrical
BESS
Energy
Costs
Methodologies
Latest updates
Back to home
Knowledge Base
FAQs
Starting with RatedPower
Site details
Main equipment
Design configuration
Grid connection point
BESS
Energy
Financial
Documents
Guides for Users
Site files
Topography files
Layout
3D scene
Security
FAQs
Location
Equipment
Layout
Topography
Grid point
Electrical
BESS
Energy
Costs
Methodologies
Latest updates
FAQs
Find quick and short answers to frequent and not-so-frequently asked questions.
Location
Where can you find the UTM zone? What about the time zone?
What’s the max project radius? What if I need it to be more?
What’s Google Earth’s topography resolution?
How can I upload contour lines?
What’s the maximum topography file size that I can upload?
Can I upload shape files?
How can I upload my own private meteorological data?
What is the minimum historical temperature?
How can I add an aerial image to the layout?
What is the maximum size for a project?
See more
Equipment
What types of modules do you allow?
Where can I upload my equipment?
Where can I upload my trackers?
How do I configure agriPV?
In terms of energy calculation, what inverter power does the software use?
Can I limit the inverter’s power? How?
Why does my structure say that it’s only designed for “monofacial”?
Which inputs will affect the recommended number of modules per string?
Why can’t I increase the number of strings per structure?
Can I combine different sizes of trackers together in the same design?
Can I have a different type of structure in each area? If not, can you propose me an intermediary solution?
What things does the “minimum ground clearance” affect?
Is RatedPower considering a derating due to temperature & altitude at the inverter level?
Why is the number of modules per string highlighted in orange?
What does the service type mean? Does it change anything?
How do I set my power station transformer’s capacity?
What transformer manufacturers do you work with or have in your database?
I need to use specific skid station sizes. How can I do so?
What’s the ridge distance?
How’s the default tilt angle calculated?
What does a 2V structure mean?
Is backtracking enabled?
How to change the MPPT configuration in RatedPower?
How can I ensure the minimum ground clearance is respected?
See more
Layout
Why do I have red structures in my layout? How can I change that?
How can I set the total number of inverters?
I put 30 MWac in “Specific capacity” but only got 18 MWac in my design. Why?
It seems that RatedPower is calculating the AC capacity wrong. If you multiply the number of inverters by the capacity of one, it should be different.
Where can I limit how much energy my plant’s providing to the grid?
Pitch distance vs clearance distance?
What is the GCR?
Where does the recommended pitch come from?
What is the minimum post depth I can define? What does the minimum ground clearance represent?
Can I set a 0 m distance from the structures to the fence?
Can I have both vertical + horizontal roads in the same area?
How does RatedPower places the roads?
The no-roads option is disabled although my site is smaller than 5ha, why?
I can’t use border adaptation, why?
Power station inside vs outside DC field? Which one’s better for a higher capacity? Why?
How does the software decide where to place the inverters and power stations?
Is the power station’s height considered in the energy yield calculation?
How can I change the distance from structures to RA?
Why is my layout rotated in the “General Layout” file?
How does the software determine the distance between the roads of a layout?
How can I define the width of the fence?
See more
Topography
What’s the resolution of the arrows shown in the topography?
I enabled some topography restrictions, but nothing happened after I simulated the design.
What’s undulation tolerance?
What’s the difference between the “linked row limit” and the rest of the slope limits?
Do you calculate the cut&fill volumes? Where can I find them?
See more
Grid point
How can I get the interconnection facility SLD in US-based symbology?
What does the “MV line max current” affect?
Why can’t I see the overhead line (OHL) options?
Why can’t I use the switching and breaking station?
Can I have a buried HV line?
How can I have a bigger substation’s transformer size than what the dropdown list shows?
The copper loss (1%) is proportional to the square of the load factor, what do you mean by that?
See more
Electrical
What’s the difference between axial vs pitch grouping?
How does the “Maximum strings per box” parameter work?
How can I set one consistent number of strings/inverter in the whole design?
What’s a harness? Why can’t I select the harness option?
What criteria do the cabling standards follow?
What is the difference between a single-core and multi-core cable?
What does the maximum number of cross-sections mean?
What does the maximum number of circuits per polarity mean?
Up to what temperature can XLPE withstand?
What type of installation do you apply to each subsystem (outside, buried in trenches, in ducts, etc...)?
Which temperature is used for the cable sizing?
Does RatedPower use leapfrog or daisy chain for the string configuration? Can I choose?
How can I define the minimum number of strings per box?
What depth and width values are being considered for trenches?
See more
BESS
Why can’t I see any BESS options?
Can I have my BESS inside the PV plant’s area?
What’s the supply cycle duration?
How can I fix my BESS’s capacity?
Energy
Do you calculate P-99?
Do you have monthly or yearly soiling losses?
Can I define my own albedo profile?
What options do you have for the horizon?
What’s the difference between far shading, near shading, and array shading?
What do the PV plant and grid availabilities mean?
What does the “years of simulation” parameter affect?
How are the cabling losses calculated?
How to increase the bifacial gain (energy produced by the module’s back face)?
What is the difference between LID and first year degradation, and what values should I use?
Do the Energy Yield Results include nighttime losses?
See more
Costs
Which exchange rate does RatedPower use to convert the prices once I change the currency?
Can I upload an Excel pricing template?
Where did you get the OPEX and discount rate default values from?
How can I add a fixed price entry to my template?